Bolted
Elevated Tanks

The Ultra-Low Maintenance Solution

Lowest Maintenance and Lifecycle Costs

The Glass Fused to Steel – Bolted Elevated Tank (GFS-BET) is an ultra-low maintenance elevated water storage design for capacities between 400m³ – 3500m³.

A concrete pedestal, glass coated steel tank, stainless steel pipe, and aluminum appurtenances results in no ongoing painting maintenance requirements.

Landmark’s robust standards ensure safety, quality, and dependability of this specialty tank product in an elevated scenario.

Please enable JavaScript in your browser to complete this form.

Request for Bolted Elevated Tank Drawings/Specifications

Project-Specific Tank Budgets

Landmark offers fully customized project budget estimates for all major tank styles.

  • Tailored to your project specifications
  • Fully inclusive of all project costs
  • Regionally adjusted for labor, materials, and current market conditions

We provide the most accurate, and detailed budgets in the industry.

Lifecycle Analysis

To select the best solution, Landmark provides a present value lifecycle cost analysis which combines a detailed assessment of:

  • Capital cost
  • Ongoing maintenance and repair costs
  • Other significant project specific costs

Impact of long-term inflation and interest are included to provide the full and accurate cost over the life of the asset – presented in today’s dollars.

The Landmark Difference

As the Bolted Elevated Tank (BET) leader, Landmark maintains the highest standards. And we ensure ultra-low maintenance by paying close attention to the details.

BET 3D Cutaway

Advanced Engineering

Engineering details on the BET are enhanced for the elevated condition. Landmark provides a robust steel tank design that exceeds minimum AWWA D103 requirements, and that are consistent with other elevated tank standards.

  • 200%+ greater minimum plate thickness
  • Lower allowable stress, resulting in a robust design

Industry Leading Concrete Process

The reinforced concrete pedestal differentiates the BET. This element must be designed and constructed precisely to satisfy critical structural, durability, and architectural requirements.

We have the experience of over 15,000 separate wall segment placements and have refined methods and controls to ensure the highest structural, durability and aesthetic standards are attained.

Our concrete specialists are experts in managing mix designs, the critical impact of environmental conditions on the placement process, rigorous quality control procedures, and the involvement of supplier partners.

Pedestal Pour
BET Bolt Pattern

Glass-Fused-to-Steel – Bolted Steel Tank

Landmark partners with Greatario for the supply and construction of the Bolted Elevated Tank.

  • No need for re-coating – Glass-Fused-to-Steel coatings are highly resistant to corrosive contaminants
  • Efficient field assembly with factory-applied coatings – avoid delays from weather and other environmental elements.
  • Can be designed to be expanded – for when future demand rises.

Landmark – the company of choice for Bolted Elevated Tanks

Speak to an expert about your next project.