The Village of Williston Park, NY required replacement of their aged elevated water storage tank infrastructure, which was no longer cost effective to maintain.
To deal with challenging site constraints on all sides, Landmark manufactured new hoisting, fabrication and erection equipment as well as developed new erection procedures to execute this project.
Operational Highlights:
- Constrained site on all sides (railroad, homes, park) required precise material handling.
- Material delivery to site on Long Island required precise scheduling.
- Demolition of existing muti-legged tank required careful safety planning and continuous environmental monitoring.
- Engineer, Procure and Construct (EPC) project.