Asset Management Plan Development & Execution

Asset Management Plan Development & Execution

The Region required complex deliverables and plans to prioritize capital expenditures on 34 tanks. Landmark developed a detailed Annual Risk Based Capital Plan and 20-year Infrastructure Improvement Program (IIP) for the Region. Operational Highlights: Landmark has...
Hemlock Water Storage Reservoir

Hemlock Water Storage Reservoir

Owners past experience with previous tank’s poor design led to additional operational costs resulting from excess corrosion in the roof structure. Landmark worked closely with the project team to provide a very low maintenance but complex self-supporting steel...
Lakeview Reservoir Dual Zone Tank Replacement

Lakeview Reservoir Dual Zone Tank Replacement

The existing elevated tank was expensive to maintain and unattractive. The Owner required two tanks to service separate pressure zones. Landmark designed a dual zone tank using architecturally pleasing pilasters to hide ladders, mechanical and electrical.  ...
Woodward Ave Wastewater Treatment Plant

Woodward Ave Wastewater Treatment Plant

The Woodward Avenue Methane Sphere recovers natural gas otherwise emitted as a waste by-product from the wastewater treatment plant. Constructed in 1970, the 24.4 m diameter sphere required maintenance and upgrades.  The owner provided a short window to perform...
Reclaimed Water System

Reclaimed Water System

This project was designed to expand the capacity of the innovative reclaimed water system and reflects the city’s progressive approach to environmental issues.  Highlights: 48 separate 175-watt photovoltaic panels that generate more than 16,500 kWh of electricity...