by Adam Reed | Oct 3, 2023
The Region required complex deliverables and plans to prioritize capital expenditures on 34 tanks. Landmark developed a detailed Annual Risk Based Capital Plan and 20-year Infrastructure Improvement Program (IIP) for the Region. Operational Highlights: Landmark has...
by Adam Reed | Oct 3, 2023
Owners past experience with previous tank’s poor design led to additional operational costs resulting from excess corrosion in the roof structure. Landmark worked closely with the project team to provide a very low maintenance but complex self-supporting steel...
by Adam Reed | Oct 3, 2023
The existing elevated tank was expensive to maintain and unattractive. The Owner required two tanks to service separate pressure zones. Landmark designed a dual zone tank using architecturally pleasing pilasters to hide ladders, mechanical and electrical. ...
by Adam Reed | Oct 3, 2023
The Big Spring refinery operated by Delek US (formerly Alon USA) has a crude oil throughput capacity of 70,000 barrels per day. Alon required an Isobutane storage sphere to be erected by Landmark. The project required precise fabrication tolerances and welding...
by Adam Reed | Oct 3, 2023
Contract Fabricators, Inc. required a large diameter ASME Code Hemispherical Head for a fluid catalytic cracker assembly at a Valero Refinery. Project timing constraints did not allow typical pre-fitting at our fabrication facility, and exacting tolerances were...