Asset Management Plan Development & Execution

Asset Management Plan Development & Execution

The Region required complex deliverables and plans to prioritize capital expenditures on 34 tanks. Landmark developed a detailed Annual Risk Based Capital Plan and 20-year Infrastructure Improvement Program (IIP) for the Region. Operational Highlights: Landmark has...
Hemlock Water Storage Reservoir

Hemlock Water Storage Reservoir

Owners past experience with previous tank’s poor design led to additional operational costs resulting from excess corrosion in the roof structure. Landmark worked closely with the project team to provide a very low maintenance but complex self-supporting steel...
Lakeview Reservoir Dual Zone Tank Replacement

Lakeview Reservoir Dual Zone Tank Replacement

The existing elevated tank was expensive to maintain and unattractive. The Owner required two tanks to service separate pressure zones. Landmark designed a dual zone tank using architecturally pleasing pilasters to hide ladders, mechanical and electrical.  ...
Isobutane Storage Sphere

Isobutane Storage Sphere

The Big Spring refinery operated by Delek US (formerly Alon USA) has a crude oil throughput capacity of 70,000 barrels per day. Alon required an Isobutane storage sphere to be erected by Landmark.  The project required precise fabrication tolerances and welding...
Custom Forming ASME Code Hemi Head

Custom Forming ASME Code Hemi Head

Contract Fabricators, Inc. required a large diameter ASME Code Hemispherical Head for a fluid catalytic cracker assembly at a Valero Refinery.  Project timing constraints did not allow typical pre-fitting at our fabrication facility, and exacting tolerances were...