by Adam Reed | Oct 3, 2023
Owners past experience with previous tank’s poor design led to additional operational costs resulting from excess corrosion in the roof structure. Landmark worked closely with the project team to provide a very low maintenance but complex self-supporting steel...
by Adam Reed | Oct 3, 2023
The existing elevated tank was expensive to maintain and unattractive. The Owner required two tanks to service separate pressure zones. Landmark designed a dual zone tank using architecturally pleasing pilasters to hide ladders, mechanical and electrical. ...
by Adam Reed | Oct 3, 2023
The Big Spring refinery operated by Delek US (formerly Alon USA) has a crude oil throughput capacity of 70,000 barrels per day. Alon required an Isobutane storage sphere to be erected by Landmark. The project required precise fabrication tolerances and welding...
by Adam Reed | Aug 15, 2023
The University of Guelph Thermal Energy Facility is the first of its type in Ontario. Within five years of being online, the tank was expected to pay for itself in energy savings. This project was required to be completed during the winter, with completion milestones...
by Adam Reed | Aug 8, 2023
Efficiently transporting viscous oil from Alberta’s tar sands region requires dilution and solids removal. CNRL required the addition of a froth tank near an extraction zone, which is designed to heat diluted bitumen, causing the viscosity to drop enough to allow...